Higher EducationOH
Posted
Oct 1, 2026
Oct 15, 2026
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
The Ohio State University is soliciting bids to replace three underground fuel storage tanks.
Browse RFPs from The Ohio State University with upcoming deadlines.
9 opportunities shown.
Higher EducationOH
Posted
Oct 1, 2026
Oct 15, 2026
The Ohio State University is soliciting bids to replace three underground fuel storage tanks.
Higher EducationOH
Posted
-
Oct 30, 2026
The project will remove the existing insertion-style chilled water and heating water meters and replace them with in-line meters compliant with the OSU Building Design Standards.
Higher EducationOH
Posted
-
Oct 29, 2026
This solicitation seeks a contractor to renovate two rooms in The Ohio State University’s Martha Morehouse Pavilion, converting an existing exam room into an Ultrasound Exam Room and creating an accessible patient toilet and patient prep room.
Higher EducationOH
Posted
Oct 8, 2026
Oct 23, 2026
The Ohio State University seeks a Criteria Architect/Engineer for an emergency generator replacement project to upgrade emergency power infrastructure at Rightmire Hall, McPherson Chemical Laboratory, and Celeste Laboratory of Chemistry.
Higher EducationOH
Posted
-
Oct 19, 2026
Work includes interior renovation of hospital.
Higher EducationOH
Posted
-
Oct 30, 2026
The project will remove the existing insertion-style chilled water and heating water meters and replace them with in-line meters compliant with the OSU Building Design Standards.
Higher EducationOH
Posted
-
Oct 29, 2026
This solicitation seeks a contractor to renovate two rooms in The Ohio State University’s Martha Morehouse Pavilion, converting an existing exam room into an Ultrasound Exam Room and creating an accessible patient toilet and patient prep room.
Higher EducationOH
Posted
Sep 11, 2026
Oct 21, 2026
Design-Build services for the relocation and renovation of Ohio Department of Rehabilitation and Correction (ODRC) clinical and inpatient operations within University Hospital Doan Hall, including an ophthalmology clinic, dialysis unit, and ambulatory surgery unit, and relocation of ODRC Armory and Lieutenant's Office.
Higher EducationOH
Posted
-
Oct 15, 2026
Project work is to replace the underground storage tanks and fuel dispensing equipment.