CityCA
Posted
Sep 30, 2026
Oct 21, 2026
2026 ADA Sidewalk Improvement RFP
work consist of 70 lf of tree root control barrier, 35 tn of asphalt concrete, 472 lf of remove and replace pcc sidewalk, 2574 sf of remove and replace pcc sidewalk, 14 lf of 12" storm drain pipe, 1 ea of remove drop inlet, 211 sf of pcc driveway conform.
