Higher EducationAL
Posted
-
Oct 29, 2026
University Boulevard Tree Replacement Project Phase II *Prequalification* RFP
Work includes large dia tree installations and related utility relocations / installations.
Description: Work includes large public water relocation no 001, small public sewer relocation no 001, cpm progress schedule, clearing and grubbing within right of way 5.000 Acre, removal and disposal of existing pavement 1,462.000 SY, removal and disposal of existing curb 7,830.000 LF, removal and disposal of existing asphalt pavement 45,495.000 SY, removal of exist guardrail 1,508.000 LF, removal and disposal of existing culvert 4'x8', culvert extension preparation, unclassified excavation 199,151.000 CY, borrow excavation 2,000.000 CY, muck excavation 1,417.000 CY, geotextile, separation 20.000 SY, structure excavation for culverts 69.000 CY. See attached file.
StateAgency · SC, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Higher EducationAL
Posted
-
Oct 29, 2026
Work includes large dia tree installations and related utility relocations / installations.
University Of California Merced
Higher EducationCA
Posted
Feb 20, 2026
Nov 16, 2026
This upgrade project will consist of the construction of a new wet well, installation of three new pumps, dedicated emergency power, increased electrical capacity and dedicated data feeds in conjunction with modifications to the existing sewer system to utilize the existing forced main.
School DistrictNC
Posted
Aug 13, 2026
Nov 13, 2026
Project includes complete renovation of the audience chamber, including removal and replacement of the existing balcony, re-raking of the existing floor, replacement of the existing theatrical and AV equipment, and significant improvements to the existing mechanical, electrical, plumbing, and fire alarm systems.
University Of North Carolina School Of The Arts
Higher EducationNC
Posted
Aug 10, 2026
Oct 23, 2026
Blum Construction, acting as construction manager at risk for UNC School of the Arts, seeks to prequalify trade contractors for Phase II of the Stevens Center renovation. The work includes replacing the theater balcony, re-raking the audience floor, replacing theatrical and audiovisual equipment, and upgrading building systems. The project also includes renovations to the lobby and basement and a new loading area.
Decision makers connected to this RFP from South Carolina Department of Transportation.