School DistrictMO
Posted
Sep 29, 2026
Oct 14, 2026
Construction Manager At-risk(cmr) Services - Request for Qualifications
Provide construction manager at-risk(cmr) services for district facility planning, design, renovation, and construction.
Description: Provide construction manager at risk (CMR) services for new AHSC Central Plant 4.16kV Switchgear Replacement project. Project is to replace the existing 4,160V switchgear within the AHSC Central Plant with new 4,160V switchgear.
HigherEducation · AZ, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from University Of Arizona.
Adjacent opportunities open for bidding right now.
School DistrictMO
Posted
Sep 29, 2026
Oct 14, 2026
Provide construction manager at-risk(cmr) services for district facility planning, design, renovation, and construction.
Posted
Jul 7, 2026
Oct 21, 2026
For the following trade(s): masonry; miscellaneous and ornamental iron; waterproofing, damp-proofing and caulking; elevators; fire protection sprinkler systems; plumbing; roofing and flashing; hvac; electrical.
North Dakota State University Main Campus
Higher EducationND
Posted
Oct 7, 2026
Oct 29, 2026
Provide construction manager at risk services for hall renovation.
Connecticut Department of Administrative Services
State AgencyCT
Posted
Oct 7, 2026
Nov 4, 2026
To provide the following type of services in support of the above-reference project. The preferred cmr team should demonstrate experience with construction and renovation of correctional facility renovations. The new haven community correctional center is a 131,000 square foot correctional facility constructed in 1976 with ballasted inverted roof membrane assembly (irma) epdm and metal clad sloped roof systems. The scope of work for the project shall include repair and replacement of the existing roof systems (with a non-irma fully adhered roof assembly), exterior facade sealant joints, and replacement of the main entrance curtainwall, vestibule, and skylight systems.