CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Central Resort District Drainage Improvements Phase 1 Design Build Project (Request For Proposal)
Design-Build: work includes central resort district drainage improvements.
Description: DESIGN-BUILD services for Interchange Improvements Project.
StateAgency · MO, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityVA
Posted
Aug 31, 2026
Nov 5, 2026
Design-Build: work includes central resort district drainage improvements.
California Department of Water Resources
State AgencyCA
Posted
Aug 27, 2026
Dec 4, 2026
DESIGN-BUILD: Potential water sources (1) existing agricultural drains, (2) groundwater wells, (3) the existing Species Conservation Habitat (SCH) Project, (4) the West Interception Ditch - to maximize the acreages of the following land use objectives (in order of priority).
California Department of Water Resources
State AgencyCA
Posted
Aug 27, 2026
Dec 4, 2026
DESIGN-BUILD: Potential water sources (1) existing agricultural drains, (2) groundwater wells, (3) the existing Species Conservation Habitat (SCH) Project, (4) the West Interception Ditch - to maximize the acreages of the following land use objectives (in order of priority).
CityFL
Posted
Oct 8, 2026
Nov 10, 2026
Professional firm to provide Construction Engineering and Inspection (CEI) services for the SR A1A Improvements project. The selected firm(s) shall provide comprehensive CEI services in accordance with the Florida Department of Transportation (FDOT) Construction Project Administration Manual (CPAM) and District-specific requirements, where applicable. See attached file.
Decision makers connected to this RFP from Missouri Department of Transportation.