Installing new fencing, installing new access control gates, removing existing fencing and gates, manufacturing and stockpiling access gates, and painting existing gates and pipe rail fences. The project includes the first four tasks under the contract which includes removing and replacing fencing, installing new gates and pipe rail at four locations. The four locations are detailed as follows: Project includes removing an existing access control gate and replacing it with a new access control double swing gate, removing and replacing two pedestrian gates. The project will remove 505 feet of barbed wire fence and replace that with new pipe rail fence. 120 feet of existing pipe rail fenced will be painted. Project includes removing existing chain link fence, building a new pedestrian access gate and adding 240' of pipe rail fencing. Rutherford. Project includes removing existing barbed wire fence and access gates, constructing new pipe rail fence, and constructing two (2) new double swing gates. Project includes removing 130’ of existing wood post and cable fence and replacing it with 200’ of new pipe rail fence.