Hacienda La Puente Unified School District
School DistrictCA
Posted
Oct 7, 2026
Nov 10, 2026
Glen a Wilson High School Replacement of Stadium Electrical Equipment & Wiring RFP
Work includes replacement of stadium electrical equipment & wiring.
Description: Adrian Public Schools seeks sealed lump-sum bids for electrical service replacement at its middle-high school in Adrian, Minnesota. The estimated project cost is $285,000, and bids will be received for a single-prime construction contract. Procurement documents are available in hard copy from EDA Inc. and may be examined through the listed construction plan rooms.
SchoolDistrict · MN, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Adrian Independent School District 511.
These related opportunities are still open for bidding.
Hacienda La Puente Unified School District
School DistrictCA
Posted
Oct 7, 2026
Nov 10, 2026
Work includes replacement of stadium electrical equipment & wiring.
School DistrictKS
Posted
-
Nov 3, 2026
The solicitation seeks bids for RTU replacement at Wilbur Middle School. The base bid covers the main replacement work, while an alternate includes replacing downstream VAV controllers for compatibility with the new TCC system. Bids close November 3, 2026, at 4:00 PM EST.
Virginia Beach City Public Schools
School DistrictVA
Posted
Oct 6, 2026
Nov 5, 2026
Brandon Middle School HVAC Replacement: Refer to Bid Documents for scope of work. Drawings and Specifications may be seen at the following locations: A&E Reprographics, Norfolk; Construct Connect; Valley Construction News (Bid Online); Dodge Data & Analytics; Builders and Contractors Exchange, Norfolk. Sets of drawings and specifications may be obtained, as complete sets of Bidding Documents, as hard copy or PDF version on CD, upon purchase for each set, from Business Document Solutions, Inc, (757) 390-2755. An additional fee for shipping or delivery may be charged for those Contractors who wish to have their sets mailed or delivered. No partial sets will be distributed. In Person Conference Date: The school grounds will be open for inspection at a non-mandatory pre-bid conference on Monday, October 19th at 4:30 PM. Contractors must sign in and obtain a visitor pass at the main entrance security desk prior to any interior or exterior building or site review. If unable to attend the non-mandatory pre-bid conference, bidders may coordinate inspection of the school grounds at a different time/date through VBCPS Project Manager Fred Reynolds by e-mailing him at fred.reynolds@vbschools.com. Bidders are not permitted to access the schools outside of the non-mandatory pre-bid conference without prior coordination with Fred Reynolds. Bidder questions may be directed to Amber Genung, Woolpert, amber.genung@woolpert.com or call (703) 731-7336. All bidder questions must be received no later than Friday October 30th, 2026. Conference Date (virtual): Date: November 5, 2026 at 2:15 PM EST. Microsoft Teams meeting information and teleconference dialing information were provided in the solicitation package.
Posted
Aug 26, 2026
Oct 20, 2026
Replacement of the 900 hp us vertical motor.