Myron Avenue Sewer Replacement Project
Work includes approx 900 SY pavement restoration; 510 LF 18" VCP item 706.08, C-700 ES; 190 LF 6" VCP sewer service connections; 1,100 SY asphalt planing and resurfacing.
Description: Sewer main replacement project. Project will remove seven (7) manholes, construct four (4) new manholes, and replace approx. 1,100 LF of existing sewer main. project will replace the existing 8" Vitrified Clay Pipe (VCP) sewer with 10" VCP sewer at the same line and grade, thereby eliminating existing deficiencies in hydraulic capacity in this reach of sewer and providing adequate capacity for ultimate flows based on the City's Sewer Master Plan.
City · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOH
Posted
Jul 1, 2026
Oct 15, 2026
Work includes approx 900 SY pavement restoration; 510 LF 18" VCP item 706.08, C-700 ES; 190 LF 6" VCP sewer service connections; 1,100 SY asphalt planing and resurfacing.
CityIL
Posted
Oct 2, 2026
Dec 1, 2026
Work includes construction of 8" and 6" water main installed by open cut construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; abandonment of existing water main; sanitary sewer removal and replacement; storm sewer removal and replacement; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main installation as shown, specified, or required.
CityIL
Posted
Oct 2, 2026
Dec 1, 2026
Work includes construction of 8" and 6" water main installed by open cut construction methods, including: pavement removal; trench excavation; water main pipe materials and installation; valves and valve vaults; fire hydrant assemblies including hydrant and auxiliary valve; water service connections; abandonment of existing water main; sanitary sewer removal and replacement; storm sewer removal and replacement; pipe bedding; trench backfill; pavement replacement; driveway replacement; curb and gutter replacement; parkway restoration; traffic control; water main pressure testing and disinfection; and all other work necessary for a complete and functional water main installation as shown, specified, or required.
CityWY
Posted
Sep 30, 2026
Oct 14, 2026
The City is seeking replacement of approximately 350 feet of 6-inch waterline and one fire hydrant assembly, plus installation and replacement of 14-inch pipe, valves, and a 14x6 tee. The work is at the intersection of North 8th Street. The contractor is to provide temporary water, traffic control, and asphalt and concrete materials; the City will provide the water-system materials and roadway base material.