Higher EducationSC
Posted
Oct 13, 2026
Nov 5, 2026
Singleton Energy Plant Boiler Replacement
Coastal Carolina University seeks bids to remove two boilers at the Singleton Building energy plant and replace them with two 3,500 MBH input condensing boilers in a phased approach. The design-bid-build project has an estimated construction cost of $400,000 to $490,000 and requires the prime contractor to hold a Heating (HT) license. Bids are due November 5, 2026, at 2:00 p.m.
