CitySD
Posted
Oct 8, 2026
Oct 29, 2026
Construction of the New Worthing City and Community Hall Project RFP
Construction of the new City and Community Hall project.
Description: Bid Packages: 01.00 General Trades 01.74 Final Cleaning 03.00 Building Concrete 03.53 Polished Concrete 04.20 Masonry 05.10 Structural Steel and Misc. Metals 06.10 Rough Carpentry 06.40 Architectural Woodwork 07.10 Waterproofing/Damproofing/Joint Sealants 07.42 Metal Panels and Exterior Cladding 07.50 Roofing 07.81 Spray Applied Fireproofing 08.10 Doors/Frames/Hardware 08.33 Overhead Coiling Doors 08.40 Exterior Curtainwall and Glazing 09.20 Metal Stud Framing/Gyp Partitions/Gyp Ceilings 09.30 Tiling 09.50 Acoustical Ceilings 09.60 Resilient and Carpet Flooring 09.66 Terrazzo Flooring 09.91 Painting and Wallcoverings 10.11 Visual Display Surfaces 10.14 Signage 10.20 Toilet Partitions/Accessories/Specialties 10.22 Operable Partitions 10.26 Wall Protection and Corner Guards 11.13 Loading Dock Equipment 11.53 Lab Equipment 12.20 Window Treatments 12.30 Lab Casework 12.93 Site Furnishings 14.20 Elevators 21.00 Fire Protection 22.00 Plumbing Systems 23.00 HVAC Systems and TAB 25.50 Building Control Systems 26.00 Electrical and Low Voltage Systems 31.00 Sitework/Earthwork 32.12 Asphalt Paving/Curb and Gutter 32.13 Concrete Paving/Unit Pavers 32.32 Site Retaining Walls 32.90 Landscaping and Irrigation 33.00 Site Utilities (Storm, Water, Sewer) 33.70 Site Electrical Utilities.
HigherEducation · NC, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CitySD
Posted
Oct 8, 2026
Oct 29, 2026
Construction of the new City and Community Hall project.
CityCA
Posted
Sep 30, 2026
Oct 21, 2026
Renovation of the 3rd and 8th floors of city hall. 8th Floor work includes new interior partitions and doors, replacement of acoustical ceiling tiles and grid, new paint, wall base, carpet and luxury vinyl tile (LVT) flooring, light mechanical and electrical modifications, and plumbing for one new sink. The 3rd Floor work includes new wall paint, wall base, carpet and LVT flooring. Work also includes demolition, removal and legal disposal of construction debris
CountyNY
Posted
Sep 20, 2026
Oct 28, 2026
Work include 30,000 sf of level-two alteration work on the first and second floors of coyne hall, including the reconfiguration of mechanical systems, new finishes, new doors, new exterior window lites, electrical, and fire protection improvements.
CountyNY
Posted
Sep 20, 2026
Oct 28, 2026
Work include 30,000 sf of level-two alteration work on the first and second floors of coyne hall, including the reconfiguration of mechanical systems, new finishes, new doors, new exterior window lites, electrical, and fire protection improvements.
Decision makers connected to this RFP from Wake Technical Community College.