FederalOK
Posted
Oct 6, 2026
Oct 19, 2026
NAFI Connector RFP
The procurement of brand-name or equal NAFI Connectors to support the Interface Test Adapter (ITA) for the B-1 program.
Description: 50 EA, conn 500 mcm 1 cond al/cu general purpose connector rated for aluminum or copper, 1 conductor of up to 500 mcm with set screw connection filled with inhibitor. Connector should have one 9/16 inch hole for mounting to stud in meter base. This connector is to have a ul listing.
SpecialDistrict · TN, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
FederalOK
Posted
Oct 6, 2026
Oct 19, 2026
The procurement of brand-name or equal NAFI Connectors to support the Interface Test Adapter (ITA) for the B-1 program.
CountyMS
Posted
Sep 24, 2026
Oct 27, 2026
Work inlcudes construction of the new taxilane connection from the existing nwcc aeronatics building apron to the existing runway and includes site clearing, site grading, reinforced concrete arch pipe, crushed stone base, asphalt pavement, loose rip rap, erosion and sedimentation control and other miscellaneous work.
CityOH
Posted
Oct 1, 2026
Dec 31, 2026
The City of Cleveland is advancing Phase 1 of the North Coast Connector, including conversion of the Shoreway (State Route 2) to a boulevard, a land bridge, West 3rd Street Bridge improvements, port access, demolition, retaining walls, sidewalks, and multi-use paths. The City anticipates a Progressive Design-Build procurement and is engaging qualified prime contractors with comparable design-build experience through an October 28, 2026 industry forum and optional one-on-one meetings. The posting is open and says procurement documents and further details will be released through the City's OpenGov portal as they become available.
FederalVA
Posted
Oct 14, 2026
Oct 22, 2026
DLA Aviation is requesting quotes for 14 connector assemblies (NSN 2840-01-036-2927), with approved source 07482, part number 9051M56G04. Delivery is to DLA Distribution San Diego within 136 days after order; the RFQ says no hard copies or specifications, plans, or drawings are available. All responsible sources may submit quotes electronically by October 22, 2026.
Decision makers connected to this RFP from Nashville Electric Service.